The work was subdivided into two phases.
Phase One comprised of the excavation of areas to create new External Hardstandings along with associated drainage works.
Phase Two included the erection of a new steel framed Unloading Canopy and associated external works.
Whilst not forming part of a direct contract between, at the same time electrical works were carried out in the areas of Phase 1 and 2 under the direction of JMH as Principal Contractor.
| Location: |
Branston, Lincoln |
| Client: |
Branston Potatoes |